Powering Saudi Arabia's sustainable future

A large-scale renewable initiative spanning solar generation, EPC, IPP and O&M, aligned with Vision 2030.

Powering Saudi Arabia's sustainable future

USD 22B

Renewable energy budget

130 GW

Renewable target by 2030

20 GW

Annual addition target

25+ Years

Project lifetime

USD 270B

Low-carbon energy investment by 2030

278 Million Tons

CO2 reduction target by 2030

366 TWh

Projected electricity demand by 2030

50%

Renewable share of the 2030 energy mix

One hundred megawatts outside Jeddah

The indicative first build is a 100 MW plant on roughly 500,000 square metres, sited where irradiance runs near 5.8 kWh per square metre per day. It connects on-grid through SEC, or off-grid with storage. Total project cost lands between USD 55 and 75 million, and it removes about 60,000 tons of CO2 a year.

5.8 kWh/m2

Daily solar irradiance

One hundred megawatts outside Jeddah

Indicative economics

What the first plant costs and returns

USD 55-75M

Total project cost

6-8 Years

Payback period

60,000 Tons

CO2 removed annually

USD 0.02-0.03

Indicative PPA tariff per kWh

Full breakdown
Solar PV system
USD 40-50M
Land acquisition or lease
USD 2-5M
EPC and installation
USD 10-15M
Grid connection
USD 3-6M
Annual operations and maintenance
USD 0.5-1M
Land requirement
500,000 m2
Project lifetime
25+ years

Six capabilities, feasibility through operations

  1. Assess

    Solar studies, land assessment, grid connectivity and financial analysis.

  2. Design

    PV system design, electrical and structural engineering, performance simulation.

  3. Procure

    Sourcing modules, inverters, mounting systems and balance of plant.

  4. Construct

    Civil works, equipment installation, electrical works and grid integration.

  5. Commission

    Testing, performance validation and handover to commercial operation.

  6. Operate

    Monitoring, preventive maintenance, cleaning and performance optimisation.

Three ways to hold the asset

EPC

EPC

Engineering, procurement and construction delivered for a third-party owner.

IPP

Independent power production, selling output under a long-term tariff.

O&M

Operations and maintenance contracted across plants built by others.

Why Saudi solar, and why now

  • Strong government commitment under Vision 2030
  • High solar potential and abundant resource
  • Attractive financial returns at utility scale
  • Sustainable and clean energy future
  • Long-term market opportunity as demand doubles